Pakistan Construction Cost Index (Monthly)

Rates last updated: Page updated: By Ali Ahmad

What this is: ConstructionCostPK’s monthly snapshot of house construction cost per sq ft in 11 Pakistani cities, with the cement, steel and brick rates behind it and the change from the previous month. It is recalculated with the same engine as our calculator every time the default rates are updated.

City-wise construction cost — October 2026

CityGrey / sq ftMoMComplete / sq ftMoM
LahorePKR 3,050baselinePKR 4,610baseline
KarachiPKR 3,019baselinePKR 4,561baseline
IslamabadPKR 3,170baselinePKR 4,805baseline
RawalpindiPKR 2,974baselinePKR 4,487baseline
FaisalabadPKR 2,899baselinePKR 4,365baseline
MultanPKR 2,868baselinePKR 4,317baseline
PeshawarPKR 2,853baselinePKR 4,292baseline
GujranwalaPKR 2,883baselinePKR 4,341baseline
SialkotPKR 2,899baselinePKR 4,365baseline
HyderabadPKR 2,868baselinePKR 4,317baseline
SargodhaPKR 2,853baselinePKR 4,292baseline

Material rates in this edition

MaterialRateMoM
Cement (50 kg bag)PKR 1,500baseline
Steel (per kg)PKR 275baseline
Bricks (per 1,000)PKR 20,000baseline

Edition: October 2026 · rates dated 15 October 2026 · new baseline: the calculation method was updated (see the methodology), so month-on-month change restarts from this edition.

Index history

MonthLahoreKarachiIslamabad
October 2026PKR 4,610PKR 4,561PKR 4,805
September 2026 (earlier method)PKR 4,248PKR 4,201PKR 4,433

How the index is calculated

Each figure is the cost per sq ft of a 1,000 sq ft single storey house at standard quality and typical design, using the default material rates of that month and each city’s labour factor. See the full methodology. You may quote these figures with a link to this page as the source.